• EISCAT 3D: the next generation international atmosphere and geospace research radar 

      Kero, Johan; Kastinen, D; Vierinen, Juha; Grydeland, Tom; Heinselman, Craig J.; Markkanen, Jussi; Tjulin, A. (Journal article; Peer reviewed, 2019)
      EISCAT 3D is the next generation international atmosphere- and geospace research radar in Arctic Europe. The EISCAT 3D construction started in September 2017 and the radar system is expected to be operational in the end ...
    • EKOREEF - Report 1: Summary 

      Cripps, S.J.; Aabel, J.P. (Research report, 1998)
      The project has delivered a comprehensive and integrated plan and feasibility study for the design, management and assessment of a complex artificial reef built on the Ekofisk field, including around the Ekofisk Tank 2/4T, ...
    • EKOREEF - Report 4: lmpacts and waste management 

      Cripps, S.J.; Hovda, J.; Eriksen, Veslemøy; Movik, E.; Kjeilen, G.; Aabel, J.P. (Research report, 1998)
      This project comprises 3 aspects: 1. To assess the positive and negative environmental impacts of the construction, short-term and long-term reuse of Ekofisk structures as artificial reefs. 2. To predict the socio-economic ...
    • EKOREEF - Report 5: Platform reef management 

      Cripps, S.J.; Forsberg, O.I.; Aabel, J.P. (Research report, 1998)
      This Management report within the Ekoreef programma has the following objectives: • to address platform reef management related issues, presenting relevant background information and placing the issue into the wider context ...
    • EKOREEF - Report 6: Monitoring 

      Jacobsen, M.; Aabel, J.P.; Cripps, S.J. (Research report, 1998)
      A follow-up monitoring and evaluation plan to assess the use and functioning of an artificial reef at Ekofisk is recommended. Experiments or surveys to obtain quantifying data that are currently unknown and which are ...
    • EKOREEF - Sub-project 6: Communications 

      Hovda, J.; Aabel, J.P.; Cripps, S.J. (Research report, 1998)
      The main aim of this report was to present a plan for the discussion of the Ekoreef concept between the current operators and various stakeholder groups. Relevant stakeholder groups were proposed, the roles of the participants ...
    • EKOREEF - Sub-project 7: Alternative use 

      Hovda, J.; Aabel, J.P.; Cripps, S.J. (Research report, 1998)
      The Ekofisk Tank 2/4T, may remain in situ and form the nucleus of the reef complex. There is therefore potcntial for the multiple use of this structure. Such alternative uses would help both to justify leaving the structures ...
    • EKOREEF – Report 3: Reef configuration 

      Hovda, J.; Jacobsen, T.G.; Aabel, J.P.; Cripps, S.J. (Research report, 1998)
      The four main aims of this study were to: define the locations of potential artificial reefs; identify and rank the usefulness of structures to be used as artificial reef components; design artificial reefs according to ...
    • Ekspertise, politikk eller dialog? Nettutvikling i Norge, Sverige og Storbritannia 

      Brekke, Ole Andreas; Sataøen, Hogne L. (Research report, 2012)
      Denne rapporten tar for seg utviklingen av kraftlinjer i sentralnettet for Norge, Sverige og Storbritannia, med særlig blikk for konsesjonssystemene i de tre landene. I rapporten brukes utbyggingsregimene for sentralnettet ...
    • eLAD: Well simulator specifications 

      Cayeux, Eric (Research report, 2007)
      eLAD is a laboratory for evaluating new drilling automation tools, new drilling advisory systems, new work processes within drilling operations, the consequences of wired pipe telemetry. The kernel of the laboratory is a ...
    • Elektroniske læringsressurser som supplerende metode i akuttmedisinkurs tilpasset allmennleger og turnusleger - et pilotprosjekt 

      Blinkenberg, Jesper; Brandstorp, Helen; Nysether, Eva Linnerud; Nielsen, Boas Krøgh; Thesen, Janecke; Flingtorp, Lars Didrik (Research report, 2011)
      Fra 2012 innføres et krav om obligatorisk akuttmedisinkurs for spesialister i allmennmedisin hvert 5. år. Det har satt fokus på innholdet i disse kursene. Mye praktisk trening er helt sentralt, men noe teorikunnskap er ...
    • Emulating sentinel-1 Doppler radial ice drift measurements using envisat ASAR data 

      Kræmer, Thomas; Johnsen, Harald; Brekke, Camilla (Peer reviewed; Journal article, 2015)
    • Emulsified scale inhibitor systems technical report 2000 

      Beare, Steve (Research report, 2000)
      The project aims to develop emulsified scale inhibitor systems suitable for application as squeeze treatments, particularly in water-sensitive wells and those with poor pressure support. The developed emulsion will be ...
    • «En felles etat» – en analyse av prosessen som ledet frem til opprettelse av ny arbeids- og velferdsforvaltning (NAV) 

      Christensen, Tom (Research report, 2008)
      Denne rapporten er en analyse av prosessen som startet 12. desember 2001 da Stortinget henstilte til Regjeringen å utrede en felles etat for sosial-, arbeidsmarkeds- og trygdeeta-ten, og som fikk sin foreløpige slutt med ...
    • En flat og fleksibel administrasjon i en hierarkisk vegetat 

      Laudal, Thomas; Westnes, Petter (Research report, 2005)
      Dette er sluttrapporten fra en evaluering av Administrasjonsavdelingen i Region vest i Statens vegvesen. Prosjektet startet våren 2004 og bygger på to intervjuer og webbaserte spørreundersøkelser gjennomført i 2004 og ...
    • En intervjuundersøkelse om tiltak for å redusere sykefraværet i grunnskolen 

      Kiær, Elisabeth; Aas, Randi W.; Ellingsen, Kjersti Lunde; Solberg, Astrid (Research report, 2010)
      Dette er en av tre rapporter fra prosjektet Sykefravær blant ansatte i grunnskolen som er utført ved forskningssenteret PreSenter ved International Research Institute of Stavanger (IRIS). Den andre rapporten handler om ...
    • En jobb for idealister? Hva fremmer og hemmer rekrutteringen til førskolelæreryrket i Rogaland 

      Bergsgard, Nils Asle; Thygesen, Janne (Research report, 2010)
      På oppdrag fra Fylkesmannen i Rogaland, Utdanningsavdelingen, har IRIS gjennomført et prosjekt om rekruttering til førskolelærerutdanningen i Rogaland. Prosjektet er en oppfølging av IRIS-rapporten ”Førskolelærermangel i ...
    • En kartlegging av karriereveier og erfaringer blant midlertidig vitenskapelig ansatte og nyansatte i vitenskapelig stilling ved UiB 

      Hope, Kristin Lofthus (Research report, 2010)
      Våren 2010 gjennomførte Uni Rokkansenteret på oppdrag fra UiB to ulike spørreskjemaundersøkelser blant midlertidige og nyansatte i vitenskapelig stillinger ved UiB. Rapporten inneholder resultater og analyser fra disse to ...
    • En kartlegging av norske forskningsmiljøer innen samfunnssikkerhet og risiko. Fellesrapport IRIS/IFE. 

      Kjestveit, Kari; Junge, Amund; Lunde-Hanssen, Linda Sofie (Research report, 2007)
      Dette er en kunnskapsoversikt over norske forskningsmiljøer innenfor samfunnssikkerhet og risiko. Forskningsmiljøene representerer både universiteter/høyskoler og forskningsgrupper som er tilknyttet disse, i tillegg til ...
    • En Kina-strategi for Vestlandsrådet og Vestlandet 

      Farsund, Arild Aurvåg (Research report, 2012)
      Kina blir en stadig viktigere aktør i den økonomiske og politisk utviklingen globalt, og dette har betydning for Norge og Vestlandet. Dette er bakgrunnen for hvorfor Vestlandsrådet lyste ut oppdraget med å vurdere hvordan ...